Description
Application Role
Part 1 is used for temporary fixation prior to the application of Part 2.
Recommended workflow:
-
Position and align the coil accurately to the acrylic face, small sections at a time
-
Apply small, spaced tacks of Part 1 A and then B to cure it instantly, around the perimeter
-
Allow sufficient set to hold shape and alignment
-
Proceed with Part 2 for full perimeter structural bonding
This approach ensures clean assembly without premature full bonding.
Key Characteristics
-
Two-part adhesive (A+B) for controlled curing and handling
-
Provides sufficient grab strength to hold coil in position
-
Allows adjustment time before applying part 2
-
Ideal for spot tacking without excessive squeeze-out
-
Compatible with the EcoSteel™ system workflow
Application Guidelines
-
Apply in small, evenly spaced tacks around the letter perimeter
-
Avoid continuous beads—this stage is for positioning, not full bonding
-
Ensure accurate alignment before adhesive sets
-
Follow with Part 2 to achieve full structural integrity
Surface Preparation
-
Surfaces must be clean, dry, and free of contaminants Clean acrylic and return with isopropanol
Positioning
Part 1 is a process-critical adhesive, not intended for structural bonding on its own. Its role is to enable fast, accurate assembly while setting up the conditions for Part 2 to deliver the final bond strength.


